![]()
Manhattan Bridge
East River Bridges Manhattan Bridge Page Manhattan Bridge Slowly Nears Peacetime Footing View rendering of propsed Manhattan Bridge Bike Path View cross-section of Manhattan Bridge When will the Manhattan Bridge Bike Path Ever Be Finished?By Steve Faust, 1997 The Manhattan Bridge side paths have been closed since the 1960s there was one on each side. The concrete paths literally fell apart, and the ornate cast iron
railings were rusting through. Also, I think there was fears of
pedestrians jumping and throwing things from the outside edge paths.
Pedestrian and bike access didnt count for much in the 50s and 60s
compared to running a neat and tidy bridge.
The roadways of the bridge are bike unfriendly. The traffic volumes are high, lanes are narrow, trucks are heavy and the expansion joints will eat a wheel to the hub. Otherwise, a lovely ride... The current NYC DOT reconstruction contract is supposed to include the reconstruction and reopening of the south/Brooklyn bound side path from the Bowery to Jay Street. The contract is for major structural (heavy steelwork) repairs of the entire south side of the bridge this is why the BMT Broadway subway is closed as well as the Brooklyn bound upper level roadway have been closed for years. The side path is just a small incidental part of a much larger project. This contract is seriously behind schedule. The most recent hang-up is the "discovery" that the old paint contains lead (big surprise!?!) and must be "abated". This is slowing the job by possibly another year or two! Its playing havoc on the Brooklyn-Manhattan subway services as well (my work interest.) This part of the work was supposed to have been completed already! Several items still require our attention:
|
© 1997-2009 Transportation Alternatives
127 West 26th Street, Suite 1002
New York, NY 10001